The Delaney Group is provide Engineering, Procurement, and Construction (EPC), of one Vestas V-82 1.65 WTG.
 
EPC Scope
1.) Finalization of existing design and construction drawings
 
2.) Site and foundation construction

3.) Site security

4.) Tower erection

5.) Tower acceptance testing

6.) Electrical wiring and grid connection