Altona Wind Farm

Client: Noble Constructors, LLC
Location: Altona, NY
Year Completed: 2008
Duration: 7 Months

Major Scope and Features:

Roadway Construction

Installation of all Wind Park Roadways including Clearing and Grubbing of Wooded Right of Way and Existing Cleared Land, Erosion Control,   Silt Fence, Temporary seeding and mulching, Check Dams, Road construction including Topsoil Stripping and Drainage, Culvert Pipes, and Box Culverts. This work encompasses 96,335 LF Access Roads with 14” Sub-base on Geo-Grid including 16,210 LF of widening of the access roads for the crane walk.  All work was in compliance with the New York State Agricultural Restoration Requirements.

Turbine Site Construction

Also included was the construction of 64 turbine site areas. This work included Clearing, Grubbing and Stripping of 200’ x 200’ Areas, Erosion Control including Silt Fencing and temporary seeding and mulching, Foundation Excavation and Backfill, Cut and Fill Work Required to Prep Site/Crane Pad. Road Constructed From Edge of 200'x200' to Crane Pad and Earthen Crane Pad Construction – 40’ x 60’.

SEO Services and Website Design by Mannix Marketing, Inc.